VideoHelp Forum




+ Reply to Thread
Results 1 to 4 of 4
  1. Member
    Join Date
    Jun 2006
    Location
    United States
    Search Comp PM
    Ok i think there might be an issue with ffmpeg inside of the Latest 2.1 version. I updated from 2.0 to 2.1 the day before yeterday and never had a problem before with 2.0 . All of a sudden the First movie i tried to convert and burn started having problems i tried doing the same movie 4 times and always had the same ffmpeg issue btw i monitored my temps and never broke over 55c on CPU and 30c on MB on all 4 attempts. So today after work i uninstalled 2.1 and reinstalled 2.0 and it worked perfect with the same movie and process that i used with the 4 prior attempts. So i thought i should post this stuff for you to look at cause not sure if this turning out to be more of a problem than with just one person and i love this program but about cried when it started to fail me "which is a first btw" .

    Below is the error message followed by the Log with error for 2.1 and then the 2.0 convert/burn which had no problem at all i can provide some nice screen shots also if needed.

    Version: SVCD2DVD 2.1
    Build: 2.1.2308.33338

    Type: System.NullReferenceException

    Source: SVCD2DVD

    Message: Object reference not set to an instance of an object.

    InnerException:

    StackTrace: at x3284ccece41ee22b.xd3764d4f1e921081.x3b9d134dac76e 484(xece14591aa1abb99

    x50afe96f7df19242, xcbd1127f90d7945f x3146d638ec378671)
    at x3284ccece41ee22b.xd3764d4f1e921081.xf81783e1b359f fc3()
    at x3284ccece41ee22b.xd3764d4f1e921081.x12cbe7a4e46ac 9ae()


    ************************************************** ******************
    ************************ SYSTEM INFORMATION ************************
    ************************************************** ******************

    ***************************** SVCD2DVD *****************************

    Name: SVCD2DVD 2.1
    Title: 2.1
    Version: 2.1.2308.33338
    Executable: C:\Program Files\BadgerIT\SVCD2DVD v2\SVCD2DVD.exe
    Executable size: 2.85 MB
    Executable size in bytes: 2998355
    Executable CreationTime: 4/27/2006 11:33:02 PM
    Executable LastWriteTime: 6/18/2006 6:03:01 PM
    Executable LastAccessTime: 6/28/2006 10:12:31 PM

    ************************* Operating System *************************

    Operating System: Microsoft Windows XP Home Edition
    Service Pack: Service Pack 2
    Version : 5.1.2600
    Windows Directory : C:\WINDOWS

    OSLanguage: 1033
    CodeSet: 1252
    CountryCode: 1
    Local: 0409

    Total Physical Memory: 0.99 GB
    Free Physical Memory: 587 MB
    Total Virtual Memory: 1.99 GB
    Free Virtual Memory: 1.96 GB

    ***************************** Computer *****************************

    Computer Manufacturer Name: ASUSTeK Computer INC.
    Computer Model: A7N8X-X
    System Type: X86-based PC
    Computer Name: MAINRIG
    DomainRole:
    Number Of Processors: 1
    User Name: MAINRIG\

    ***************************** Processor ****************************

    Manufacturer: AuthenticAMD
    Processor: AMD Athlon(tm) XP 2800+
    Description: x86 Family 6 Model 10 Stepping 0
    CPU Speed: 2.088GHz
    CPU FSB: 166MHz
    L2 Cache Size: 512 bytes

    ***************************** Time Zone ****************************

    Time Zone: (GMT-05:00) Eastern Time (US & Canada)

    ****************************** VIDEO *******************************

    Name: RADEON 9200
    Processor: RADEON 9200 AGP (0x5961)
    Mode: 1280 x 1024 x 4294967296 colors
    Video Ram: 128 MB
    Status: OK

    Name: RADEON 9200 - Secondary
    Processor: RADEON 9200 Secondary AGP (0x5941)
    Mode:
    Video Ram: 128 MB
    Status: OK

    ****************************** Drives *******************************

    DeviceID: C:
    FileSystem: NTFS
    Size: 121 GB
    FreeSpace: 71.4 GB

    DeviceID: D:
    FileSystem: NTFS
    Size: 68.8 GB
    FreeSpace: 36.1 GB

    ************************************************** ******************
    ********************* END OF SYSTEM INFORMATION ********************
    ************************************************** ******************

    ************************* ProjectMetaData **************************

    <SVCD2DVD DateTime="6/28/2006 6:16:38 PM" Filename="NONE"><AssetSet><Asset

    ID="1a02ed01-80ea-4e27-8c44-c377ae7c5a92" Path="C:\Movies\Click" Filename="mvn-clickts01.avi"

    /><Asset ID="2402d150-459f-41f8-93ee-fa41be61727d" Path="C:\Movies\Click"

    Filename="mvn-clickts02.avi" /></AssetSet><DVDStructure><TitleSet Name="New Movie"

    PostCmd="" MenuButtonType="0"><MenuButton X1="0" Y1="0" X2="262" Y2="49"

    FontFamily="Tahoma" FontSize="28" FontStyle="3">Menu Button</MenuButton><Title

    Name="mvn-clickts01.avi" AssetID="1a02ed01-80ea-4e27-8c44-c377ae7c5a92" MplexOffset="0"

    /><Title Name="mvn-clickts02.avi" AssetID="2402d150-459f-41f8-93ee-fa41be61727d"

    MplexOffset="0" /></TitleSet><DVDMenu Normal="-1" Highlight="-65536" Active="-16711681"

    ShowPlayAllButton="False" DSOffsetWidth="1" DSOffsetHeight="1" DSColor="0" DSOnOff="True"

    BackgroundImagePath="C:\Program Files\BadgerIT\SVCD2DVD v2\default.jpg" AudioPath=""

    /></DVDStructure><Settings><General InitialAssetFolder="D:\Downloads\SVCD Movies"

    InitialDVDFolder="D:\Downloads\SVCD Movies" InitialProjectFolder="D:\Downloads\SVCD Movies"

    InitialMenuBackgroundFolder="" DeleteS2DFiles="True" UseDVDShrink="False" /><Menu

    AudioEncoding="Custom_mpa" DefaultCustomAudioPath="" DefaultCustomImagePath=""

    TVStandard="NTSC" FontFamily="Tahoma" FontSize="28" FontStyle="3" PlayAllText="Play All"

    Loop="True" ShowMenuStandardWarning="True" EncodeVideo2AudioDuration="False" /><Process

    AudioEncoding="mpa" Chapters="Every 30 mins" SkipMPA48="False" SkipAC3="True" PanSan="False"

    MergeTitles="False" UsePulldown="True" PAL2NTSC="True" AVI2PASS="False" AVI2HALFD1="FS"

    NoBframes_FullME="False" UseCustomMatrices="False" IntraMatrix="" NonIntraMatrix=""

    TVOverscanPixels="0" UseThreads="True" /><Program BINExtraction="vcdxrip" VCDGearFIX="False"

    FastAudioEncode="True" /><Burning BurningMethod="DVD Decrypter" DVDDrive="SONY DVD RW

    DRU-710A " NeroWriteSpeed="Max" Eject="True" HighDVDCompat="False" VerifyDVD="False"

    DVDDecrypterPath="C:\Program Files\DVD Decrypter\dvddecrypter.exe" DVDDErase="True"

    DVDDClose="False" DVDDDontBurn="False" /></Settings></SVCD2DVD>

    ************************* ProjectMetaData **************************
    Processing assets for DVD creation

    =================== AV Details ===================
    File Size: 702 MB
    file=C:\Movies\Click\mvn-clickts01.avi
    FormatName=avi
    Num_Frames=71250
    DurationInSecs=2850
    Duration=00:47:30.0
    VideoCodec=mpeg4
    Width=704
    Height=416
    Standard=PAL
    BitRate=2069
    AudioStreamCount=1
    Audio1StreamID=[0x1]
    Audio1SampleRate=44100
    Audio1Codec=mp3
    Audio1BitRate=128
    Audio1Channels=2
    =================== AV Details ===================

    AVI2MPG: 5752kbs Full-D1
    18:16:38: Looking for AVI PAR...
    Pass 1/1: Processing mvn-clickts01.avi
    18:16:39: FFmpeg version CVS, Copyright (c) 2000-2004 Fabrice Bellard

    18:16:39: configuration: --enable-a52 --enable-gpl --enable-memalign-hack --disable-debug

    --enable-pthreads

    18:16:39: libavutil version: 49.0.0

    18:16:39: libavcodec version: 51.4.0

    18:16:39: libavformat version: 50.2.1

    18:16:39: built on Mar 14 2006 17:24:07, gcc: 3.4.4 (mingw special)

    18:16:39: Input #0, avi, from 'C:\Movies\Click\mvn-clickts01.avi':

    18:16:39: Duration: 00:47:30.0, start: 0.000000, bitrate: 2069 kb/s

    18:16:39: Stream #0.0, 25.00 fps(r): Video: mpeg4, yuv420p, 704x416

    18:16:39: Output #0, dvd, to 'C:\Movies\Click\mvn-clickts01_S2D.mpg':

    18:16:39: Stream #0.0, 25.00 fps(c): Video: mpeg2video (hq), yuv420p, 720x480, q=1-31, 5752

    kb/s

    18:16:39: Stream #0.1: Audio: mp2, 48000 Hz, stereo, 224 kb/s

    18:16:39: Stream mapping:

    18:16:39: Stream #0.0 -> #0.0

    18:16:39: Stream #0.1 -> #0.1

    19:00:07: video:1998480kB audio:77929kB global headers:0kB muxing overhead 1.903351%

    19:00:07: AVI2MPG: done.
    PAL->NTSC: demuxing mvn-clickts01_S2D.mpg
    19:00:08: FFmpeg version CVS, Copyright (c) 2000-2004 Fabrice Bellard

    19:00:08: configuration: --enable-a52 --enable-gpl --enable-memalign-hack --disable-debug

    --enable-pthreads

    19:00:08: libavutil version: 49.0.0

    19:00:08: libavcodec version: 51.4.0

    19:00:08: libavformat version: 50.2.1

    19:00:08: built on Mar 14 2006 17:24:07, gcc: 3.4.4 (mingw special)

    19:00:08: Input #0, mpeg, from 'C:\Movies\Click\mvn-clickts01_S2DPAL.mpg':

    19:00:08: Duration: 00:47:29.6, start: 0.500000, bitrate: 6082 kb/s

    19:00:08: Stream #0.0[0x1e0], 25.00 fps(r): Video: mpeg2video, yuv420p, 720x480, 7800 kb/s

    19:00:08: Stream #0.1[0x1c0]: Audio: mp2, 48000 Hz, stereo, 224 kb/s

    19:00:08: Output #0, rawvideo, to 'C:\Movies\Click\mvn-clickts01_S2DPAL.mpv':

    19:00:08: Stream #0.0, 25.00 fps(c): Video: mpeg2video, yuv420p, 720x480, q=2-31, 7800 kb/s

    19:00:08: Output #1, mp2, to 'C:\Movies\Click\mvn-clickts01_S2DPAL.mp2':

    19:00:08: Stream #1.0: Audio: mp2, 48000 Hz, stereo, 224 kb/s

    19:00:08: Stream mapping:

    19:00:08: Stream #0.0 -> #0.0

    19:00:08: Stream #0.1 -> #1.0

    19:04:06: video:1998480kB audio:77929kB global headers:0kB muxing overhead -3.753068%

    19:04:06: PAL->NTSC: Applying Pulldown mvn-clickts01_S2DPAL.mpv
    19:04:06: SVCD2DVD: Convert2NTSC: Converting....

    19:12:09: PAL->NTSC: Muxing mvn-clickts01_S2D.mpg

    =================== AV Details ===================
    File Size: 693 MB
    file=C:\Movies\Click\mvn-clickts02.avi
    FormatName=avi
    Num_Frames=80536
    DurationInSecs=3221
    Duration=00:53:41.4
    VideoCodec=mpeg4
    Width=704
    Height=416
    Standard=PAL
    BitRate=1805
    AudioStreamCount=1
    Audio1StreamID=[0x1]
    Audio1SampleRate=44100
    Audio1Codec=mp3
    Audio1BitRate=128
    Audio1Channels=2
    =================== AV Details ===================

    AVI2MPG: 5752kbs Full-D1
    19:16:24: Looking for AVI PAR...
    19:16:24: INFO: [???] mplex version 2.0.0 (2.2.3 $Date: 2004/01/13 20:45:26 $)

    19:16:24: INFO: [???] File C:\Movies\Click\mvn-clickts01_S2DPAL_pd.mpv looks like an MPEG Video

    stream.

    19:16:24: INFO: [???] File C:\Movies\Click\mvn-clickts01_S2DPAL.mp2 looks like an MPEG Audio

    stream.

    19:16:24: INFO: [???] Video stream 0: profile 8 selected - ignoring non-standard options!

    19:16:24: INFO: [???] Found 1 audio streams and 1 video streams

    19:16:24: INFO: [???] Selecting dvdauthor DVD output profile

    19:16:24: INFO: [???] Multiplexing video program stream!

    19:16:24: INFO: [???] Scanning for header info: Video stream e0

    (C:\Movies\Click\mvn-clickts01_S2DPAL_pd.mpv)

    19:16:24: INFO: [???] VIDEO STREAM: e0

    19:16:24: INFO: [???] Frame width : 720

    19:16:24: INFO: [???] Frame height : 480

    19:16:24: INFO: [???] Aspect ratio : 16:9 display

    19:16:24: INFO: [???] Picture rate : 29.970 frames/sec

    19:16:24: INFO: [???] Bit rate : 7800000 bits/sec

    19:16:24: INFO: [???] Vbv buffer size : 229376 bytes

    19:16:24: INFO: [???] CSPF : 0

    19:16:24: INFO: [???] Scanning for header info: Audio stream c0

    (C:\Movies\Click\mvn-clickts01_S2DPAL.mp2)

    19:16:24: INFO: [???] MPEG AUDIO STREAM: c0

    19:16:24: INFO: [???] Audio version : 1.0

    19:16:24: INFO: [???] Layer : 2

    19:16:24: INFO: [???] CRC checksums : no

    19:16:24: INFO: [???] Bit rate : 28672 bytes/sec (224 kbit/sec)

    19:16:24: INFO: [???] Frequency : 48000 Hz

    19:16:24: INFO: [???] Mode : 0 stereo

    19:16:24: INFO: [???] Mode extension : 0

    19:16:24: INFO: [???] Copyright bit : 0 no copyright

    19:16:24: INFO: [???] Original/Copy : 1 original

    19:16:24: INFO: [???] Emphasis : 0 none

    19:16:24: INFO: [???] SYSTEMS/PROGRAM stream:

    19:16:24: INFO: [???] rough-guess multiplexed stream data rate : 8195200

    19:16:24: INFO: [???] target data-rate specified : 10080000

    19:16:24: INFO: [???] Setting specified specified data rate: 10080000

    19:16:24: INFO: [???] Run-in Sectors = 89 Video delay = 13019 Audio delay = 0

    19:16:24: INFO: [???] New sequence commences...

    19:16:24: INFO: [???] Video e0: buf= 0 frame=000000 sector=00000000

    19:16:24: INFO: [???] Audio c0: buf= 0 frame=000000 sector=00000000

    19:16:24: INFO: [???] STREAM e0 completed @ frame 71248.

    19:16:24: INFO: [???] STREAM c0 completed @ frame 118748.

    19:16:24: INFO: [???] Multiplex completion at SCR=256503222.

    19:16:24: INFO: [???] Video e0: buf= 62343 frame=071248 sector=01013006

    19:16:24: INFO: [???] Audio c0: buf= 2688 frame=118748 sector=00039505

    19:16:24: INFO: [???] VIDEO_STATISTICS: e0

    19:16:24: INFO: [???] Video Stream length: 2046443145 bytes

    19:16:24: INFO: [???] Sequence headers: 4801

    19:16:24: INFO: [???] Sequence ends : 0

    19:16:24: INFO: [???] No. Pictures : 71249

    19:16:24: INFO: [???] No. Groups : 4801

    19:16:24: INFO: [???] No. I Frames : 4801 avg. size 53898 bytes

    19:16:24: INFO: [???] No. P Frames : 18950 avg. size 40812 bytes

    19:16:24: INFO: [???] No. B Frames : 47499 avg. size 21353 bytes

    19:16:24: INFO: [???] Average bit-rate : 5744000 bits/sec

    19:16:24: INFO: [???] Peak bit-rate : 9612800 bits/sec

    19:16:24: INFO: [???] BUFFERING min 15 Buf max 171704

    19:16:24: INFO: [???] AUDIO_STATISTICS: c0

    19:16:24: INFO: [???] Audio stream length 79799328 bytes.

    19:16:24: INFO: [???] Syncwords : 118749

    19:16:24: INFO: [???] Frames : 118749 padded

    19:16:24: INFO: [???] Frames : 0 unpadded

    19:16:24: INFO: [???] BUFFERING min 15 Buf max 683

    19:16:24: INFO: [???] MUX STATUS: no under-runs detected.

    Pass 1/1: Processing mvn-clickts02.avi
    19:16:26: FFmpeg version CVS, Copyright (c) 2000-2004 Fabrice Bellard

    19:16:26: configuration: --enable-a52 --enable-gpl --enable-memalign-hack --disable-debug

    --enable-pthreads

    19:16:26: libavutil version: 49.0.0

    19:16:26: libavcodec version: 51.4.0

    19:16:26: libavformat version: 50.2.1

    19:16:26: built on Mar 14 2006 17:24:07, gcc: 3.4.4 (mingw special)

    19:16:26: Input #0, avi, from 'C:\Movies\Click\mvn-clickts02.avi':

    19:16:26: Duration: 00:53:41.4, start: 0.000000, bitrate: 1805 kb/s

    19:16:26: Stream #0.0, 25.00 fps(r): Video: mpeg4, yuv420p, 704x416

    19:16:26: Output #0, dvd, to 'C:\Movies\Click\mvn-clickts02_S2D.mpg':

    19:16:26: Stream #0.0, 25.00 fps(c): Video: mpeg2video (hq), yuv420p, 720x480, q=1-31, 5752

    kb/s

    19:16:26: Stream #0.1: Audio: mp2, 48000 Hz, stereo, 224 kb/s

    19:16:26: Stream mapping:

    19:16:26: Stream #0.0 -> #0.0

    19:16:26: Stream #0.1 -> #0.1

    19:43:46: AVI2MPG: done.
    PAL->NTSC: demuxing mvn-clickts02_S2D.mpg


    ************************************************** ***********************************
    ************************************************** ***********************************
    THIS IS WITH 2.0 AND IT DID"NT HAVE THE SAME ISSUE AS 2.1

    ************************************************** ******************
    ************************ SYSTEM INFORMATION ************************
    ************************************************** ******************

    ***************************** SVCD2DVD *****************************

    Name: SVCD2DVD 2.0
    Title: 2.0
    Version: 2.0.2117.24512
    Executable: C:\Program Files\BadgerIT\SVCD2DVD v2\SVCD2DVD.exe
    Executable size: 2.51 MB
    Executable size in bytes: 2633811
    Executable CreationTime: 10/18/2005 7:21:08 PM
    Executable LastWriteTime: 6/29/2006 10:04:25 PM
    Executable LastAccessTime: 6/29/2006 10:04:38 PM

    ************************* Operating System *************************

    Operating System: Microsoft Windows XP Home Edition
    Service Pack: Service Pack 2
    Version : 5.1.2600
    Windows Directory : C:\WINDOWS

    OSLanguage: 1033
    CodeSet: 1252
    CountryCode: 1
    Local: 0409

    Total Physical Memory: 0.99 GB
    Free Physical Memory: 580 MB
    Total Virtual Memory: 1.99 GB
    Free Virtual Memory: 1.96 GB

    ***************************** Computer *****************************

    Computer Manufacturer Name: ASUSTeK Computer INC.
    Computer Model: A7N8X-X
    System Type: X86-based PC
    Computer Name: MAINRIG
    DomainRole:
    Number Of Processors: 1
    User Name: MAINRIG\

    ***************************** Processor ****************************

    Manufacturer: AuthenticAMD
    Processor: AMD Athlon(tm) XP 2800+
    Description: x86 Family 6 Model 10 Stepping 0
    CPU Speed: 2.088GHz
    CPU FSB: 166MHz
    L2 Cache Size: 512 bytes

    ***************************** Time Zone ****************************

    Time Zone: (GMT-05:00) Eastern Time (US & Canada)

    ****************************** VIDEO *******************************

    Name: RADEON 9200
    Processor: RADEON 9200 AGP (0x5961)
    Mode: 1280 x 1024 x 4294967296 colors
    Video Ram: 128 MB
    Status: OK

    Name: RADEON 9200 - Secondary
    Processor: RADEON 9200 Secondary AGP (0x5941)
    Mode:
    Video Ram: 128 MB
    Status: OK

    ****************************** Drives *******************************

    DeviceID: C:
    FileSystem: NTFS
    Size: 121 GB
    FreeSpace: 68.8 GB

    DeviceID: D:
    FileSystem: NTFS
    Size: 68.8 GB
    FreeSpace: 36.1 GB

    ************************************************** ******************
    ********************* END OF SYSTEM INFORMATION ********************
    ************************************************** ******************

    ************************* ProjectMetaData **************************

    <SVCD2DVD DateTime="6/29/2006 6:06:20 PM"><AssetSet><Asset

    ID="468da335-25f3-4988-8828-25e2c8369dd5" Path="C:\Movies\Click" Filename="mvn-clickts01.avi"

    /><Asset ID="abd850aa-878e-4649-b2bc-b11774ddb234" Path="C:\Movies\Click"

    Filename="mvn-clickts02.avi" /></AssetSet><DVDStructure><TitleSet Name="New Movie"

    PostCmd="" MenuButtonType="0"><MenuButton X1="0" Y1="0" X2="262" Y2="49"

    FontFamily="Tahoma" FontSize="28" FontStyle="3">Menu Button</MenuButton><Title

    Name="mvn-clickts01.avi" AssetID="468da335-25f3-4988-8828-25e2c8369dd5" MplexOffset="0"

    /><Title Name="mvn-clickts02.avi" AssetID="abd850aa-878e-4649-b2bc-b11774ddb234"

    MplexOffset="0" /></TitleSet><DVDMenu TVStandard="NTSC" Normal="-1" Highlight="-65536"

    Active="-16711681" ShowPlayAllButton="False" DSOffsetWidth="1" DSOffsetHeight="1" DSColor="0"

    DSOnOff="True" BackgroundImagePath="C:\Program Files\BadgerIT\SVCD2DVD v2\default.jpg"

    AudioPath="" /></DVDStructure><Settings><General InitialAssetFolder="D:\Downloads\SVCD

    Movies" InitialDVDFolder="D:\Downloads\SVCD Movies" InitialProjectFolder="D:\Downloads\SVCD

    Movies" DeleteS2DFiles="True" UseDVDShrink="False" /><Menu AudioEncoding="Custom_mpa"

    DefaultCustomAudioPath="" DefaultCustomImagePath="" TVStandard="NTSC" FontFamily="Tahoma"

    FontSize="28" FontStyle="3" PlayAllText="Play All" Loop="True" EncodeVideo2AudioDuration="False"

    /><Process AudioEncoding="mpa" Chapters="Every 30 mins" SkipMPA48="False" SkipAC3="True"

    PanSan="False" MergeTitles="False" UsePulldown="True" PAL2NTSC="True" AVI2PASS="False"

    AVI2HALFD1="FS" NoBframes_FullME="False" UseCustomMatrices="False" IntraMatrix=""

    NonIntraMatrix="" /><Program BINExtraction="vcdxrip" VCDGearFIX="False" FastAudioEncode="True"

    /><Burning BurningMethod="DVD Decrypter" DVDDrive="SONY DVD RW DRU-710A "

    NeroWriteSpeed="Max" Eject="True" HighDVDCompat="False" VerifyDVD="False"

    DVDDecrypterPath="C:\Program Files\DVD Decrypter\dvddecrypter.exe" DVDDErase="True"

    DVDDClose="False" DVDDDontBurn="False" /></Settings></SVCD2DVD>

    ************************* ProjectMetaData **************************
    Processing assets for DVD creation

    =================== AV Details ===================
    file=C:\Movies\Click\mvn-clickts01.avi
    FormatName=avi
    Num_Frames=71250
    DurationInSecs=2850
    Duration=00:47:30.0
    VideoCodec=mpeg4
    Width=704
    Height=416
    Standard=PAL
    BitRate=2069
    AudioStreamCount=1
    Audio1SampleRate=44100
    Audio1Codec=mp3
    Audio1BitRate=128
    Audio2SampleRate=-1
    Audio2Codec=NULL
    Audio2BitRate=-1
    =================== AV Details ===================

    AVI2MPG: 5752kbs Full-D1
    18:06:20: Looking for AVI PAR...
    Pass 1/1: Processing mvn-clickts01.avi
    18:06:21: ffmpeg version CVS, build 3276800, Copyright (c) 2000-2004 Fabrice Bellard

    18:06:21: configuration: --enable-a52 --enable-gpl --enable-memalign-hack --disable-debug

    --enable-vhook

    18:06:21: built on Oct 8 2005 16:10:52, gcc: 3.2.3 (mingw special 20030504-1)

    18:06:21: Input #0, avi, from 'C:\Movies\Click\mvn-clickts01.avi':

    18:06:21: Duration: 00:47:30.0, start: 0.000000, bitrate: 2069 kb/s

    18:06:21: Stream #0.0, 25.00 fps: Video: mpeg4, yuv420p, 704x416

    18:06:21: Output #0, dvd, to 'C:\Movies\Click\mvn-clickts01_S2D.mpg':

    18:06:21: Stream #0.0, 25.00 fps: Video: mpeg2video (hq), yuv420p, 720x480, q=1-31, 5752 kb/s

    18:06:21: Stream #0.1: Audio: mp2, 48000 Hz, stereo, 224 kb/s

    18:06:21: Stream mapping:

    18:06:21: Stream #0.0 -> #0.0

    18:06:21: Stream #0.1 -> #0.1

    18:50:24: video:1998522kB audio:77929kB global headers:0kB muxing overhead 1.890776%

    18:50:24: AVI2MPG: done.
    PAL->NTSC: demuxing mvn-clickts01_S2D.mpg
    18:50:25: ffmpeg version CVS, build 3276800, Copyright (c) 2000-2004 Fabrice Bellard

    18:50:25: configuration: --enable-a52 --enable-gpl --enable-memalign-hack --disable-debug

    --enable-vhook

    18:50:25: built on Oct 8 2005 16:10:52, gcc: 3.2.3 (mingw special 20030504-1)

    18:50:25: Input #0, mpeg, from 'C:\Movies\Click\mvn-clickts01_S2DPAL.mpg':

    18:50:25: Duration: 00:47:29.7, start: 0.500000, bitrate: 6081 kb/s

    18:50:25: Stream #0.0[0x1e0], 25.00 fps: Video: mpeg2video, yuv420p, 720x480, 7800 kb/s

    18:50:25: Stream #0.1[0x1c0]: Audio: mp2, 48000 Hz, stereo, 224 kb/s

    18:50:25: Output #0, rawvideo, to 'C:\Movies\Click\mvn-clickts01_S2DPAL.mpv':

    18:50:25: Stream #0.0, 25.00 fps: Video: mpeg2video, 720x480, q=2-31, 7800 kb/s

    18:50:25: Output #1, mp2, to 'C:\Movies\Click\mvn-clickts01_S2DPAL.mp2':

    18:50:25: Stream #1.0: Audio: mp2, 48000 Hz, stereo, 224 kb/s

    18:50:25: Stream mapping:

    18:50:25: Stream #0.0 -> #0.0

    18:50:25: Stream #0.1 -> #1.0

    18:54:23: PAL->NTSC: Applying Pulldown mvn-clickts01_S2DPAL.mpv
    18:54:23: video:1998522kB audio:77929kB global headers:0kB muxing overhead -3.752992%

    18:54:23: SVCD2DVD: Convert2NTSC: Converting....

    19:02:17: PAL->NTSC: Muxing mvn-clickts01_S2D.mpg

    =================== AV Details ===================
    file=C:\Movies\Click\mvn-clickts02.avi
    FormatName=avi
    Num_Frames=80536
    DurationInSecs=3221
    Duration=00:53:41.4
    VideoCodec=mpeg4
    Width=704
    Height=416
    Standard=PAL
    BitRate=1805
    AudioStreamCount=1
    Audio1SampleRate=44100
    Audio1Codec=mp3
    Audio1BitRate=128
    Audio2SampleRate=-1
    Audio2Codec=NULL
    Audio2BitRate=-1
    =================== AV Details ===================

    AVI2MPG: 5752kbs Full-D1
    19:06:16: Looking for AVI PAR...
    19:06:17: INFO: [???] mplex version 2.0.0 (2.2.3 $Date: 2004/01/13 20:45:26 $)

    19:06:17: INFO: [???] File C:\Movies\Click\mvn-clickts01_S2DPAL_pd.mpv looks like an MPEG Video

    stream.

    19:06:17: INFO: [???] File C:\Movies\Click\mvn-clickts01_S2DPAL.mp2 looks like an MPEG Audio

    stream.

    19:06:17: INFO: [???] Video stream 0: profile 8 selected - ignoring non-standard options!

    19:06:17: INFO: [???] Found 1 audio streams and 1 video streams

    19:06:17: INFO: [???] Selecting dvdauthor DVD output profile

    19:06:17: INFO: [???] Multiplexing video program stream!

    19:06:17: INFO: [???] Scanning for header info: Video stream e0

    (C:\Movies\Click\mvn-clickts01_S2DPAL_pd.mpv)

    19:06:17: INFO: [???] VIDEO STREAM: e0

    19:06:17: INFO: [???] Frame width : 720

    19:06:17: INFO: [???] Frame height : 480

    19:06:17: INFO: [???] Aspect ratio : 16:9 display

    19:06:17: INFO: [???] Picture rate : 29.970 frames/sec

    19:06:17: INFO: [???] Bit rate : 7800000 bits/sec

    19:06:17: INFO: [???] Vbv buffer size : 229376 bytes

    19:06:17: INFO: [???] CSPF : 0

    19:06:17: INFO: [???] Scanning for header info: Audio stream c0

    (C:\Movies\Click\mvn-clickts01_S2DPAL.mp2)

    19:06:17: INFO: [???] MPEG AUDIO STREAM: c0

    19:06:17: INFO: [???] Audio version : 1.0

    19:06:17: INFO: [???] Layer : 2

    19:06:17: INFO: [???] CRC checksums : no

    19:06:17: INFO: [???] Bit rate : 28672 bytes/sec (224 kbit/sec)

    19:06:17: INFO: [???] Frequency : 48000 Hz

    19:06:17: INFO: [???] Mode : 0 stereo

    19:06:17: INFO: [???] Mode extension : 0

    19:06:17: INFO: [???] Copyright bit : 0 no copyright

    19:06:17: INFO: [???] Original/Copy : 1 original

    19:06:17: INFO: [???] Emphasis : 0 none

    19:06:17: INFO: [???] SYSTEMS/PROGRAM stream:

    19:06:17: INFO: [???] rough-guess multiplexed stream data rate : 8195200

    19:06:17: INFO: [???] target data-rate specified : 10080000

    19:06:17: INFO: [???] Setting specified specified data rate: 10080000

    19:06:17: INFO: [???] Run-in Sectors = 89 Video delay = 13019 Audio delay = 0

    19:06:17: INFO: [???] New sequence commences...

    19:06:17: INFO: [???] Video e0: buf= 0 frame=000000 sector=00000000

    19:06:17: INFO: [???] Audio c0: buf= 0 frame=000000 sector=00000000

    19:06:17: INFO: [???] STREAM e0 completed @ frame 71248.

    19:06:17: INFO: [???] STREAM c0 completed @ frame 118748.

    19:06:17: INFO: [???] Multiplex completion at SCR=256503222.

    19:06:17: INFO: [???] Video e0: buf= 60469 frame=071248 sector=01013213

    19:06:17: INFO: [???] Audio c0: buf= 2688 frame=118748 sector=00039505

    19:06:17: INFO: [???] VIDEO_STATISTICS: e0

    19:06:17: INFO: [???] Video Stream length: 2046486465 bytes

    19:06:17: INFO: [???] Sequence headers: 5089

    19:06:17: INFO: [???] Sequence ends : 0

    19:06:17: INFO: [???] No. Pictures : 71249

    19:06:17: INFO: [???] No. Groups : 5089

    19:06:17: INFO: [???] No. I Frames : 5089 avg. size 53986 bytes

    19:06:17: INFO: [???] No. P Frames : 18662 avg. size 40696 bytes

    19:06:17: INFO: [???] No. B Frames : 47499 avg. size 21310 bytes

    19:06:17: INFO: [???] Average bit-rate : 5744000 bits/sec

    19:06:17: INFO: [???] Peak bit-rate : 12630000 bits/sec

    19:06:17: INFO: [???] BUFFERING min 15 Buf max 172765

    19:06:17: INFO: [???] AUDIO_STATISTICS: c0

    19:06:17: INFO: [???] Audio stream length 79799328 bytes.

    19:06:17: INFO: [???] Syncwords : 118749

    19:06:17: INFO: [???] Frames : 118749 padded

    19:06:17: INFO: [???] Frames : 0 unpadded

    19:06:17: INFO: [???] BUFFERING min 15 Buf max 683

    19:06:17: INFO: [???] MUX STATUS: no under-runs detected.

    Pass 1/1: Processing mvn-clickts02.avi
    19:06:19: ffmpeg version CVS, build 3276800, Copyright (c) 2000-2004 Fabrice Bellard

    19:06:19: configuration: --enable-a52 --enable-gpl --enable-memalign-hack --disable-debug

    --enable-vhook

    19:06:19: built on Oct 8 2005 16:10:52, gcc: 3.2.3 (mingw special 20030504-1)

    19:06:19: Input #0, avi, from 'C:\Movies\Click\mvn-clickts02.avi':

    19:06:19: Duration: 00:53:41.4, start: 0.000000, bitrate: 1805 kb/s

    19:06:19: Stream #0.0, 25.00 fps: Video: mpeg4, yuv420p, 704x416

    19:06:19: Output #0, dvd, to 'C:\Movies\Click\mvn-clickts02_S2D.mpg':

    19:06:19: Stream #0.0, 25.00 fps: Video: mpeg2video (hq), yuv420p, 720x480, q=1-31, 5752 kb/s

    19:06:19: Stream #0.1: Audio: mp2, 48000 Hz, stereo, 224 kb/s

    19:06:19: Stream mapping:

    19:06:19: Stream #0.0 -> #0.0

    19:06:19: Stream #0.1 -> #0.1

    19:55:36: video:2259621kB audio:88085kB global headers:0kB muxing overhead 1.891700%

    19:55:36: AVI2MPG: done.
    PAL->NTSC: demuxing mvn-clickts02_S2D.mpg
    19:55:37: ffmpeg version CVS, build 3276800, Copyright (c) 2000-2004 Fabrice Bellard

    19:55:37: configuration: --enable-a52 --enable-gpl --enable-memalign-hack --disable-debug

    --enable-vhook

    19:55:37: built on Oct 8 2005 16:10:52, gcc: 3.2.3 (mingw special 20030504-1)

    19:55:37: Input #0, mpeg, from 'C:\Movies\Click\mvn-clickts02_S2DPAL.mpg':

    19:55:37: Duration: 00:53:41.2, start: 0.500000, bitrate: 6083 kb/s

    19:55:37: Stream #0.0[0x1e0], 25.00 fps: Video: mpeg2video, yuv420p, 720x480, 7800 kb/s

    19:55:37: Stream #0.1[0x1c0]: Audio: mp2, 48000 Hz, stereo, 224 kb/s

    19:55:37: Output #0, rawvideo, to 'C:\Movies\Click\mvn-clickts02_S2DPAL.mpv':

    19:55:37: Stream #0.0, 25.00 fps: Video: mpeg2video, 720x480, q=2-31, 7800 kb/s

    19:55:37: Output #1, mp2, to 'C:\Movies\Click\mvn-clickts02_S2DPAL.mp2':

    19:55:37: Stream #1.0: Audio: mp2, 48000 Hz, stereo, 224 kb/s

    19:55:37: Stream mapping:

    19:55:37: Stream #0.0 -> #0.0

    19:55:37: Stream #0.1 -> #1.0

    19:59:27: video:2259621kB audio:88085kB global headers:0kB muxing overhead -3.751966%

    19:59:27: PAL->NTSC: Applying Pulldown mvn-clickts02_S2DPAL.mpv
    19:59:27: SVCD2DVD: Convert2NTSC: Converting....

    20:08:20: PAL->NTSC: Muxing mvn-clickts02_S2D.mpg
    20:12:30: Done: Processing assets for DVD creation
    Authoring DVD Folders
    20:12:30: Creating TitleSet # 1
    20:12:30: SVCD2DVD: DVDfolders

    Generating DVD folders please wait....

    20:12:30: -->: DVDFolders creating VTS

    20:12:30: -->: VTS 01

    20:12:30:
    DVD Folders: Processing C:\Movies\Click\mvn-clickts01_S2D.mpg...

    20:12:30: INFO: [???] mplex version 2.0.0 (2.2.3 $Date: 2004/01/13 20:45:26 $)

    20:12:30: INFO: [???] File C:\Movies\Click\mvn-clickts02_S2DPAL_pd.mpv looks like an MPEG Video

    stream.

    20:12:30: INFO: [???] File C:\Movies\Click\mvn-clickts02_S2DPAL.mp2 looks like an MPEG Audio

    stream.

    20:12:30: INFO: [???] Video stream 0: profile 8 selected - ignoring non-standard options!

    20:12:30: INFO: [???] Found 1 audio streams and 1 video streams

    20:12:30: INFO: [???] Selecting dvdauthor DVD output profile

    20:12:30: INFO: [???] Multiplexing video program stream!

    20:12:30: INFO: [???] Scanning for header info: Video stream e0

    (C:\Movies\Click\mvn-clickts02_S2DPAL_pd.mpv)

    20:12:30: INFO: [???] VIDEO STREAM: e0

    20:12:30: INFO: [???] Frame width : 720

    20:12:30: INFO: [???] Frame height : 480

    20:12:30: INFO: [???] Aspect ratio : 16:9 display

    20:12:30: INFO: [???] Picture rate : 29.970 frames/sec

    20:12:30: INFO: [???] Bit rate : 7800000 bits/sec

    20:12:30: INFO: [???] Vbv buffer size : 229376 bytes

    20:12:30: INFO: [???] CSPF : 0

    20:12:30: INFO: [???] Scanning for header info: Audio stream c0

    (C:\Movies\Click\mvn-clickts02_S2DPAL.mp2)

    20:12:30: INFO: [???] MPEG AUDIO STREAM: c0

    20:12:30: INFO: [???] Audio version : 1.0

    20:12:30: INFO: [???] Layer : 2

    20:12:30: INFO: [???] CRC checksums : no

    20:12:30: INFO: [???] Bit rate : 28672 bytes/sec (224 kbit/sec)

    20:12:30: INFO: [???] Frequency : 48000 Hz

    20:12:30: INFO: [???] Mode : 0 stereo

    20:12:30: INFO: [???] Mode extension : 0

    20:12:30: INFO: [???] Copyright bit : 0 no copyright

    20:12:30: INFO: [???] Original/Copy : 1 original

    20:12:30: INFO: [???] Emphasis : 0 none

    20:12:30: INFO: [???] SYSTEMS/PROGRAM stream:

    20:12:30: INFO: [???] rough-guess multiplexed stream data rate : 8195200

    20:12:30: INFO: [???] target data-rate specified : 10080000

    20:12:30: INFO: [???] Setting specified specified data rate: 10080000

    20:12:30: INFO: [???] Run-in Sectors = 89 Video delay = 13019 Audio delay = 0

    20:12:30: INFO: [???] New sequence commences...

    20:12:30: INFO: [???] Video e0: buf= 0 frame=000000 sector=00000000

    20:12:30: INFO: [???] Audio c0: buf= 0 frame=000000 sector=00000000

    20:12:30: INFO: [???] STREAM e0 completed @ frame 80534.

    20:12:30: INFO: [???] STREAM c0 completed @ frame 134224.

    20:12:30: INFO: [???] Multiplex completion at SCR=289933604.

    20:12:30: INFO: [???] Video e0: buf= 36967 frame=080534 sector=01145505

    20:12:30: INFO: [???] Audio c0: buf= 2016 frame=134224 sector=00044654

    20:12:30: INFO: [???] VIDEO_STATISTICS: e0

    20:12:30: INFO: [???] Video Stream length: 2313852189 bytes

    20:12:30: INFO: [???] Sequence headers: 5666

    20:12:30: INFO: [???] Sequence ends : 0

    20:12:30: INFO: [???] No. Pictures : 80535

    20:12:30: INFO: [???] No. Groups : 5666

    20:12:30: INFO: [???] No. I Frames : 5666 avg. size 51739 bytes

    20:12:30: INFO: [???] No. P Frames : 21180 avg. size 40863 bytes

    20:12:30: INFO: [???] No. B Frames : 53690 avg. size 21515 bytes

    20:12:30: INFO: [???] Average bit-rate : 5746000 bits/sec

    20:12:30: INFO: [???] Peak bit-rate : 13089600 bits/sec

    20:12:30: INFO: [???] BUFFERING min 15 Buf max 144428

    20:12:30: INFO: [???] AUDIO_STATISTICS: c0

    20:12:30: INFO: [???] Audio stream length 90199200 bytes.

    20:12:30: INFO: [???] Syncwords : 134225

    20:12:30: INFO: [???] Frames : 134225 padded

    20:12:30: INFO: [???] Frames : 0 unpadded

    20:12:30: INFO: [???] BUFFERING min 15 Buf max 683

    20:12:30: INFO: [???] MUX STATUS: no under-runs detected.

    20:17:20:
    DVD Folders: Processing C:\Movies\Click\mvn-clickts02_S2D.mpg...

    20:22:04:

    20:25:00:

    20:25:00: Finalising DVD...
    20:25:00: SVCD2DVD: DVDfolders

    Generating DVD folders please wait....

    20:25:00: -->: DVDFolders creating table of contents

    20:25:00: scanning D:\Downloads\SVCD Movies\SVCD2DVD_OUTPUT\VIDEO_TS/VTS_01_0.IFO

    20:25:00: Finalising DVD...Done
    20:25:00: Done: Authoring DVD Folders
    Burning DVD folder
    20:25:00: Creating ISO...
    20:25:05: 0.22% done, estimate finish Thu Jun 29 20:40:01 2006

    20:25:08: 0.44% done, estimate finish Thu Jun 29 20:47:33 2006

    20:25:11: 0.67% done, estimate finish Thu Jun 29 20:47:33 2006

    20:25:14: 0.89% done, estimate finish Thu Jun 29 20:47:34 2006

    20:25:14: 1.11% done, estimate finish Thu Jun 29 20:43:03 2006

    20:25:16: 1.33% done, estimate finish Thu Jun 29 20:42:33 2006

    20:25:17: 1.55% done, estimate finish Thu Jun 29 20:41:07 2006

    20:25:18: 1.77% done, estimate finish Thu Jun 29 20:40:03 2006

    20:25:19: 2.00% done, estimate finish Thu Jun 29 20:39:13 2006

    20:25:21: 2.22% done, estimate finish Thu Jun 29 20:39:18 2006

    20:25:23: 2.44% done, estimate finish Thu Jun 29 20:39:22 2006

    20:25:24: 2.66% done, estimate finish Thu Jun 29 20:38:48 2006

    20:25:26: 2.88% done, estimate finish Thu Jun 29 20:38:54 2006

    20:25:27: 3.11% done, estimate finish Thu Jun 29 20:38:26 2006

    20:25:28: 3.33% done, estimate finish Thu Jun 29 20:38:03 2006

    20:25:29: 3.55% done, estimate finish Thu Jun 29 20:37:42 2006

    20:25:30: 3.77% done, estimate finish Thu Jun 29 20:37:24 2006

    20:25:32: 3.99% done, estimate finish Thu Jun 29 20:37:33 2006

    20:25:33: 4.22% done, estimate finish Thu Jun 29 20:37:17 2006

    20:25:34: 4.44% done, estimate finish Thu Jun 29 20:37:03 2006

    20:25:36: 4.66% done, estimate finish Thu Jun 29 20:37:11 2006

    20:25:36: 4.88% done, estimate finish Thu Jun 29 20:36:38 2006

    20:25:37: 5.10% done, estimate finish Thu Jun 29 20:36:27 2006

    20:25:38: 5.32% done, estimate finish Thu Jun 29 20:36:18 2006

    20:25:40: 5.55% done, estimate finish Thu Jun 29 20:36:27 2006

    20:25:41: 5.77% done, estimate finish Thu Jun 29 20:36:18 2006

    20:25:42: 5.99% done, estimate finish Thu Jun 29 20:36:09 2006

    20:25:43: 6.21% done, estimate finish Thu Jun 29 20:36:02 2006

    20:25:44: 6.43% done, estimate finish Thu Jun 29 20:35:54 2006

    20:25:45: 6.65% done, estimate finish Thu Jun 29 20:35:48 2006

    20:25:47: 6.88% done, estimate finish Thu Jun 29 20:35:56 2006

    20:25:47: 7.10% done, estimate finish Thu Jun 29 20:35:35 2006

    20:25:49: 7.32% done, estimate finish Thu Jun 29 20:35:44 2006

    20:25:50: 7.54% done, estimate finish Thu Jun 29 20:35:38 2006

    20:25:51: 7.76% done, estimate finish Thu Jun 29 20:35:33 2006

    20:25:53: 7.99% done, estimate finish Thu Jun 29 20:35:40 2006

    20:25:54: 8.21% done, estimate finish Thu Jun 29 20:35:35 2006

    20:25:56: 8.43% done, estimate finish Thu Jun 29 20:35:42 2006

    20:25:57: 8.65% done, estimate finish Thu Jun 29 20:35:37 2006

    20:25:57: 8.87% done, estimate finish Thu Jun 29 20:35:21 2006

    20:25:59: 9.09% done, estimate finish Thu Jun 29 20:35:28 2006

    20:26:00: 9.32% done, estimate finish Thu Jun 29 20:35:24 2006

    20:26:02: 9.54% done, estimate finish Thu Jun 29 20:35:31 2006

    20:26:03: 9.76% done, estimate finish Thu Jun 29 20:35:26 2006

    20:26:05: 9.98% done, estimate finish Thu Jun 29 20:35:33 2006

    20:26:07: 10.20% done, estimate finish Thu Jun 29 20:35:39 2006

    20:26:07: 10.43% done, estimate finish Thu Jun 29 20:35:25 2006

    20:26:08: 10.65% done, estimate finish Thu Jun 29 20:35:21 2006

    20:26:10: 10.87% done, estimate finish Thu Jun 29 20:35:27 2006

    20:26:11: 11.09% done, estimate finish Thu Jun 29 20:35:24 2006

    20:26:13: 11.31% done, estimate finish Thu Jun 29 20:35:29 2006

    20:26:14: 11.53% done, estimate finish Thu Jun 29 20:35:26 2006

    20:26:16: 11.76% done, estimate finish Thu Jun 29 20:35:31 2006

    20:26:16: 11.98% done, estimate finish Thu Jun 29 20:35:19 2006

    20:26:18: 12.20% done, estimate finish Thu Jun 29 20:35:24 2006

    20:26:19: 12.42% done, estimate finish Thu Jun 29 20:35:21 2006

    20:26:21: 12.64% done, estimate finish Thu Jun 29 20:35:26 2006

    20:26:22: 12.87% done, estimate finish Thu Jun 29 20:35:23 2006

    20:26:22: 13.09% done, estimate finish Thu Jun 29 20:35:13 2006

    20:26:23: 13.31% done, estimate finish Thu Jun 29 20:35:10 2006

    20:26:25: 13.53% done, estimate finish Thu Jun 29 20:35:15 2006

    20:26:26: 13.75% done, estimate finish Thu Jun 29 20:35:12 2006

    20:26:27: 13.97% done, estimate finish Thu Jun 29 20:35:10 2006

    20:26:28: 14.20% done, estimate finish Thu Jun 29 20:35:07 2006

    20:26:29: 14.42% done, estimate finish Thu Jun 29 20:35:05 2006

    20:26:31: 14.64% done, estimate finish Thu Jun 29 20:35:09 2006

    20:26:32: 14.86% done, estimate finish Thu Jun 29 20:35:07 2006

    20:26:33: 15.08% done, estimate finish Thu Jun 29 20:35:05 2006

    20:26:34: 15.31% done, estimate finish Thu Jun 29 20:35:03 2006

    20:26:36: 15.53% done, estimate finish Thu Jun 29 20:35:07 2006

    20:26:37: 15.75% done, estimate finish Thu Jun 29 20:35:05 2006

    20:26:38: 15.97% done, estimate finish Thu Jun 29 20:35:03 2006

    20:26:39: 16.19% done, estimate finish Thu Jun 29 20:35:01 2006

    20:26:40: 16.41% done, estimate finish Thu Jun 29 20:34:59 2006

    20:26:42: 16.64% done, estimate finish Thu Jun 29 20:35:03 2006

    20:26:43: 16.86% done, estimate finish Thu Jun 29 20:35:01 2006

    20:26:44: 17.08% done, estimate finish Thu Jun 29 20:34:59 2006

    20:26:46: 17.30% done, estimate finish Thu Jun 29 20:35:03 2006

    20:26:46: 17.52% done, estimate finish Thu Jun 29 20:34:55 2006

    20:26:47: 17.75% done, estimate finish Thu Jun 29 20:34:53 2006

    20:26:48: 17.97% done, estimate finish Thu Jun 29 20:34:51 2006

    20:26:49: 18.19% done, estimate finish Thu Jun 29 20:34:50 2006

    20:26:50: 18.41% done, estimate finish Thu Jun 29 20:34:48 2006

    20:26:51: 18.63% done, estimate finish Thu Jun 29 20:34:46 2006

    20:26:52: 18.85% done, estimate finish Thu Jun 29 20:34:45 2006

    20:26:54: 19.08% done, estimate finish Thu Jun 29 20:34:49 2006

    20:26:55: 19.30% done, estimate finish Thu Jun 29 20:34:47 2006

    20:26:57: 19.52% done, estimate finish Thu Jun 29 20:34:51 2006

    20:26:58: 19.74% done, estimate finish Thu Jun 29 20:34:49 2006

    20:26:59: 19.96% done, estimate finish Thu Jun 29 20:34:48 2006

    20:27:00: 20.19% done, estimate finish Thu Jun 29 20:34:46 2006

    20:27:01: 20.41% done, estimate finish Thu Jun 29 20:34:45 2006

    20:27:02: 20.63% done, estimate finish Thu Jun 29 20:34:43 2006

    20:27:03: 20.85% done, estimate finish Thu Jun 29 20:34:42 2006

    20:27:04: 21.07% done, estimate finish Thu Jun 29 20:34:40 2006

    20:27:05: 21.29% done, estimate finish Thu Jun 29 20:34:39 2006

    20:27:07: 21.52% done, estimate finish Thu Jun 29 20:34:42 2006

    20:27:07: 21.74% done, estimate finish Thu Jun 29 20:34:37 2006

    20:27:09: 21.96% done, estimate finish Thu Jun 29 20:34:40 2006

    20:27:10: 22.18% done, estimate finish Thu Jun 29 20:34:39 2006

    20:27:11: 22.40% done, estimate finish Thu Jun 29 20:34:37 2006

    20:27:13: 22.63% done, estimate finish Thu Jun 29 20:34:41 2006

    20:27:14: 22.85% done, estimate finish Thu Jun 29 20:34:39 2006

    20:27:15: 23.07% done, estimate finish Thu Jun 29 20:34:38 2006

    20:27:16: 23.29% done, estimate finish Thu Jun 29 20:34:37 2006

    20:27:17: 23.51% done, estimate finish Thu Jun 29 20:34:36 2006

    20:27:18: 23.73% done, estimate finish Thu Jun 29 20:34:35 2006

    20:27:19: 23.96% done, estimate finish Thu Jun 29 20:34:33 2006

    20:27:20: 24.18% done, estimate finish Thu Jun 29 20:34:32 2006

    20:27:21: 24.40% done, estimate finish Thu Jun 29 20:34:31 2006

    20:27:22: 24.62% done, estimate finish Thu Jun 29 20:34:30 2006

    20:27:24: 24.84% done, estimate finish Thu Jun 29 20:34:33 2006

    20:27:25: 25.07% done, estimate finish Thu Jun 29 20:34:32 2006

    20:27:27: 25.29% done, estimate finish Thu Jun 29 20:34:35 2006

    20:27:28: 25.51% done, estimate finish Thu Jun 29 20:34:34 2006

    20:27:29: 25.73% done, estimate finish Thu Jun 29 20:34:33 2006

    20:27:30: 25.95% done, estimate finish Thu Jun 29 20:34:32 2006

    20:27:30: 26.17% done, estimate finish Thu Jun 29 20:34:27 2006

    20:27:32: 26.40% done, estimate finish Thu Jun 29 20:34:30 2006

    20:27:33: 26.62% done, estimate finish Thu Jun 29 20:34:29 2006

    20:27:34: 26.84% done, estimate finish Thu Jun 29 20:34:28 2006

    20:27:35: 27.06% done, estimate finish Thu Jun 29 20:34:27 2006

    20:27:37: 27.28% done, estimate finish Thu Jun 29 20:34:30 2006

    20:27:38: 27.51% done, estimate finish Thu Jun 29 20:34:29 2006

    20:27:39: 27.73% done, estimate finish Thu Jun 29 20:34:28 2006

    20:27:40: 27.95% done, estimate finish Thu Jun 29 20:34:27 2006

    20:27:41: 28.17% done, estimate finish Thu Jun 29 20:34:26 2006

    20:27:43: 28.39% done, estimate finish Thu Jun 29 20:34:29 2006

    20:27:44: 28.61% done, estimate finish Thu Jun 29 20:34:28 2006

    20:27:46: 28.84% done, estimate finish Thu Jun 29 20:34:30 2006

    20:27:47: 29.06% done, estimate finish Thu Jun 29 20:34:26 2006

    20:27:48: 29.28% done, estimate finish Thu Jun 29 20:34:28 2006

    20:27:48: 29.50% done, estimate finish Thu Jun 29 20:34:24 2006

    20:27:49: 29.72% done, estimate finish Thu Jun 29 20:34:23 2006

    20:27:50: 29.95% done, estimate finish Thu Jun 29 20:34:23 2006

    20:27:51: 30.17% done, estimate finish Thu Jun 29 20:34:22 2006

    20:27:52: 30.39% done, estimate finish Thu Jun 29 20:34:21 2006

    20:27:54: 30.61% done, estimate finish Thu Jun 29 20:34:23 2006

    20:27:55: 30.83% done, estimate finish Thu Jun 29 20:34:23 2006

    20:27:56: 31.05% done, estimate finish Thu Jun 29 20:34:22 2006

    20:27:56: 31.28% done, estimate finish Thu Jun 29 20:34:18 2006

    20:27:57: 31.50% done, estimate finish Thu Jun 29 20:34:17 2006

    20:27:58: 31.72% done, estimate finish Thu Jun 29 20:34:16 2006

    20:28:00: 31.94% done, estimate finish Thu Jun 29 20:34:19 2006

    20:28:01: 32.16% done, estimate finish Thu Jun 29 20:34:18 2006

    20:28:02: 32.38% done, estimate finish Thu Jun 29 20:34:17 2006

    20:28:03: 32.61% done, estimate finish Thu Jun 29 20:34:17 2006

    20:28:04: 32.83% done, estimate finish Thu Jun 29 20:34:16 2006

    20:28:05: 33.05% done, estimate finish Thu Jun 29 20:34:15 2006

    20:28:06: 33.27% done, estimate finish Thu Jun 29 20:34:15 2006

    20:28:07: 33.49% done, estimate finish Thu Jun 29 20:34:14 2006

    20:28:08: 33.72% done, estimate finish Thu Jun 29 20:34:13 2006

    20:28:09: 33.94% done, estimate finish Thu Jun 29 20:34:13 2006

    20:28:10: 34.16% done, estimate finish Thu Jun 29 20:34:12 2006

    20:28:11: 34.38% done, estimate finish Thu Jun 29 20:34:11 2006

    20:28:13: 34.60% done, estimate finish Thu Jun 29 20:34:13 2006

    20:28:14: 34.83% done, estimate finish Thu Jun 29 20:34:13 2006

    20:28:15: 35.05% done, estimate finish Thu Jun 29 20:34:12 2006

    20:28:16: 35.27% done, estimate finish Thu Jun 29 20:34:12 2006

    20:28:16: 35.49% done, estimate finish Thu Jun 29 20:34:08 2006

    20:28:17: 35.71% done, estimate finish Thu Jun 29 20:34:08 2006

    20:28:18: 35.93% done, estimate finish Thu Jun 29 20:34:07 2006

    20:28:19: 36.16% done, estimate finish Thu Jun 29 20:34:06 2006

    20:28:20: 36.38% done, estimate finish Thu Jun 29 20:34:06 2006

    20:28:21: 36.60% done, estimate finish Thu Jun 29 20:34:05 2006

    20:28:22: 36.82% done, estimate finish Thu Jun 29 20:34:05 2006

    20:28:23: 37.04% done, estimate finish Thu Jun 29 20:34:04 2006

    20:28:24: 37.26% done, estimate finish Thu Jun 29 20:34:04 2006

    20:28:25: 37.49% done, estimate finish Thu Jun 29 20:34:03 2006

    20:28:26: 37.71% done, estimate finish Thu Jun 29 20:34:02 2006

    20:28:27: 37.93% done, estimate finish Thu Jun 29 20:34:02 2006

    20:28:28: 38.15% done, estimate finish Thu Jun 29 20:34:01 2006

    20:28:29: 38.37% done, estimate finish Thu Jun 29 20:34:01 2006

    20:28:30: 38.60% done, estimate finish Thu Jun 29 20:34:00 2006

    20:28:31: 38.82% done, estimate finish Thu Jun 29 20:34:00 2006

    20:28:32: 39.04% done, estimate finish Thu Jun 29 20:33:59 2006

    20:28:33: 39.26% done, estimate finish Thu Jun 29 20:33:59 2006

    20:28:33: 39.48% done, estimate finish Thu Jun 29 20:33:56 2006

    20:28:34: 39.71% done, estimate finish Thu Jun 29 20:33:55 2006

    20:28:36: 39.93% done, estimate finish Thu Jun 29 20:33:57 2006

    20:28:37: 40.15% done, estimate finish Thu Jun 29 20:33:57 2006

    20:28:37: 40.37% done, estimate finish Thu Jun 29 20:33:54 2006

    20:28:38: 40.59% done, estimate finish Thu Jun 29 20:33:54 2006

    20:28:39: 40.81% done, estimate finish Thu Jun 29 20:33:53 2006

    20:28:40: 41.04% done, estimate finish Thu Jun 29 20:33:53 2006

    20:28:41: 41.26% done, estimate finish Thu Jun 29 20:33:52 2006

    20:28:42: 41.48% done, estimate finish Thu Jun 29 20:33:52 2006

    20:28:43: 41.70% done, estimate finish Thu Jun 29 20:33:51 2006

    20:28:44: 41.92% done, estimate finish Thu Jun 29 20:33:51 2006

    20:28:45: 42.14% done, estimate finish Thu Jun 29 20:33:51 2006

    20:28:46: 42.37% done, estimate finish Thu Jun 29 20:33:50 2006

    20:28:47: 42.59% done, estimate finish Thu Jun 29 20:33:50 2006

    20:28:47: 42.81% done, estimate finish Thu Jun 29 20:33:47 2006

    20:28:48: 43.03% done, estimate finish Thu Jun 29 20:33:47 2006

    20:28:49: 43.25% done, estimate finish Thu Jun 29 20:33:46 2006

    20:28:50: 43.48% done, estimate finish Thu Jun 29 20:33:46 2006

    20:28:51: 43.70% done, estimate finish Thu Jun 29 20:33:46 2006

    20:28:52: 43.92% done, estimate finish Thu Jun 29 20:33:45 2006

    20:28:53: 44.14% done, estimate finish Thu Jun 29 20:33:45 2006

    20:28:53: 44.36% done, estimate finish Thu Jun 29 20:33:42 2006

    20:28:54: 44.59% done, estimate finish Thu Jun 29 20:33:42 2006

    20:28:55: 44.81% done, estimate finish Thu Jun 29 20:33:42 2006

    20:28:56: 45.03% done, estimate finish Thu Jun 29 20:33:41 2006

    20:28:57: 45.25% done, estimate finish Thu Jun 29 20:33:41 2006

    20:28:57: 45.47% done, estimate finish Thu Jun 29 20:33:38 2006

    20:28:58: 45.69% done, estimate finish Thu Jun 29 20:33:38 2006

    20:28:59: 45.92% done, estimate finish Thu Jun 29 20:33:38 2006

    20:29:00: 46.14% done, estimate finish Thu Jun 29 20:33:37 2006

    20:29:01: 46.36% done, estimate finish Thu Jun 29 20:33:37 2006

    20:29:02: 46.58% done, estimate finish Thu Jun 29 20:33:37 2006

    20:29:03: 46.80% done, estimate finish Thu Jun 29 20:33:36 2006

    20:29:04: 47.02% done, estimate finish Thu Jun 29 20:33:36 2006

    20:29:04: 47.25% done, estimate finish Thu Jun 29 20:33:34 2006

    20:29:05: 47.47% done, estimate finish Thu Jun 29 20:33:33 2006

    20:29:06: 47.69% done, estimate finish Thu Jun 29 20:33:33 2006

    20:29:06: 47.91% done, estimate finish Thu Jun 29 20:33:31 2006

    20:29:07: 48.13% done, estimate finish Thu Jun 29 20:33:30 2006

    20:29:09: 48.36% done, estimate finish Thu Jun 29 20:33:32 2006

    20:29:09: 48.58% done, estimate finish Thu Jun 29 20:33:30 2006

    20:29:10: 48.80% done, estimate finish Thu Jun 29 20:33:30 2006

    20:29:11: 49.02% done, estimate finish Thu Jun 29 20:33:29 2006

    20:29:12: 49.24% done, estimate finish Thu Jun 29 20:33:29 2006

    20:29:13: 49.46% done, estimate finish Thu Jun 29 20:33:29 2006

    20:29:13: 49.69% done, estimate finish Thu Jun 29 20:33:27 2006

    20:29:14: 49.91% done, estimate finish Thu Jun 29 20:33:26 2006

    20:29:16: 50.13% done, estimate finish Thu Jun 29 20:33:28 2006

    20:29:16: 50.35% done, estimate finish Thu Jun 29 20:33:26 2006

    20:29:17: 50.57% done, estimate finish Thu Jun 29 20:33:26 2006

    20:29:18: 50.80% done, estimate finish Thu Jun 29 20:33:25 2006

    20:29:19: 51.02% done, estimate finish Thu Jun 29 20:33:25 2006

    20:29:20: 51.24% done, estimate finish Thu Jun 29 20:33:25 2006

    20:29:20: 51.46% done, estimate finish Thu Jun 29 20:33:23 2006

    20:29:21: 51.68% done, estimate finish Thu Jun 29 20:33:23 2006

    20:29:22: 51.90% done, estimate finish Thu Jun 29 20:33:22 2006

    20:29:23: 52.13% done, estimate finish Thu Jun 29 20:33:22 2006

    20:29:24: 52.35% done, estimate finish Thu Jun 29 20:33:22 2006

    20:29:25: 52.57% done, estimate finish Thu Jun 29 20:33:22 2006

    20:29:26: 52.79% done, estimate finish Thu Jun 29 20:33:22 2006

    20:29:26: 53.01% done, estimate finish Thu Jun 29 20:33:19 2006

    20:29:27: 53.24% done, estimate finish Thu Jun 29 20:33:19 2006

    20:29:28: 53.46% done, estimate finish Thu Jun 29 20:33:19 2006

    20:29:29: 53.68% done, estimate finish Thu Jun 29 20:33:19 2006

    20:29:30: 53.90% done, estimate finish Thu Jun 29 20:33:19 2006

    20:29:31: 54.12% done, estimate finish Thu Jun 29 20:33:19 2006

    20:29:32: 54.34% done, estimate finish Thu Jun 29 20:33:18 2006

    20:29:33: 54.57% done, estimate finish Thu Jun 29 20:33:18 2006

    20:29:33: 54.79% done, estimate finish Thu Jun 29 20:33:16 2006

    20:29:34: 55.01% done, estimate finish Thu Jun 29 20:33:16 2006

    20:29:35: 55.23% done, estimate finish Thu Jun 29 20:33:16 2006

    20:29:36: 55.45% done, estimate finish Thu Jun 29 20:33:16 2006

    20:29:37: 55.68% done, estimate finish Thu Jun 29 20:33:15 2006

    20:29:37: 55.90% done, estimate finish Thu Jun 29 20:33:13 2006

    20:29:38: 56.12% done, estimate finish Thu Jun 29 20:33:13 2006

    20:29:39: 56.34% done, estimate finish Thu Jun 29 20:33:13 2006

    20:29:40: 56.56% done, estimate finish Thu Jun 29 20:33:13 2006

    20:29:40: 56.78% done, estimate finish Thu Jun 29 20:33:11 2006

    20:29:41: 57.01% done, estimate finish Thu Jun 29 20:33:11 2006

    20:29:42: 57.23% done, estimate finish Thu Jun 29 20:33:11 2006

    20:29:43: 57.45% done, estimate finish Thu Jun 29 20:33:11 2006

    20:29:44: 57.67% done, estimate finish Thu Jun 29 20:33:10 2006

    20:29:45: 57.89% done, estimate finish Thu Jun 29 20:33:10 2006

    20:29:47: 58.12% done, estimate finish Thu Jun 29 20:33:12 2006

    20:29:47: 58.34% done, estimate finish Thu Jun 29 20:33:10 2006

    20:29:48: 58.56% done, estimate finish Thu Jun 29 20:33:10 2006

    20:29:49: 58.78% done, estimate finish Thu Jun 29 20:33:10 2006

    20:29:50: 59.00% done, estimate finish Thu Jun 29 20:33:10 2006

    20:29:51: 59.22% done, estimate finish Thu Jun 29 20:33:09 2006

    20:29:52: 59.45% done, estimate finish Thu Jun 29 20:33:09 2006

    20:29:52: 59.67% done, estimate finish Thu Jun 29 20:33:08 2006

    20:29:53: 59.89% done, estimate finish Thu Jun 29 20:33:07 2006

    20:29:54: 60.11% done, estimate finish Thu Jun 29 20:33:07 2006

    20:29:55: 60.33% done, estimate finish Thu Jun 29 20:33:07 2006

    20:29:56: 60.56% done, estimate finish Thu Jun 29 20:33:07 2006

    20:29:56: 60.78% done, estimate finish Thu Jun 29 20:33:05 2006

    20:29:57: 61.00% done, estimate finish Thu Jun 29 20:33:05 2006

    20:29:58: 61.22% done, estimate finish Thu Jun 29 20:33:05 2006

    20:29:59: 61.44% done, estimate finish Thu Jun 29 20:33:05 2006

    20:30:00: 61.66% done, estimate finish Thu Jun 29 20:33:05 2006

    20:30:00: 61.89% done, estimate finish Thu Jun 29 20:33:03 2006

    20:30:01: 62.11% done, estimate finish Thu Jun 29 20:33:03 2006

    20:30:02: 62.33% done, estimate finish Thu Jun 29 20:33:03 2006

    20:30:03: 62.55% done, estimate finish Thu Jun 29 20:33:03 2006

    20:30:04: 62.77% done, estimate finish Thu Jun 29 20:33:03 2006

    20:30:07: 63.00% done, estimate finish Thu Jun 29 20:33:06 2006

    20:30:07: 63.22% done, estimate finish Thu Jun 29 20:33:04 2006

    20:30:08: 63.44% done, estimate finish Thu Jun 29 20:33:04 2006

    20:30:08: 63.66% done, estimate finish Thu Jun 29 20:33:02 2006

    20:30:09: 63.88% done, estimate finish Thu Jun 29 20:33:02 2006

    20:30:10: 64.10% done, estimate finish Thu Jun 29 20:33:02 2006

    20:30:11: 64.33% done, estimate finish Thu Jun 29 20:33:02 2006

    20:30:12: 64.55% done, estimate finish Thu Jun 29 20:33:02 2006

    20:30:13: 64.77% done, estimate finish Thu Jun 29 20:33:02 2006

    20:30:14: 64.99% done, estimate finish Thu Jun 29 20:33:02 2006

    20:30:15: 65.21% done, estimate finish Thu Jun 29 20:33:01 2006

    20:30:16: 65.44% done, estimate finish Thu Jun 29 20:33:01 2006

    20:30:16: 65.66% done, estimate finish Thu Jun 29 20:33:00 2006

    20:30:17: 65.88% done, estimate finish Thu Jun 29 20:33:00 2006

    20:30:18: 66.10% done, estimate finish Thu Jun 29 20:33:00 2006

    20:30:19: 66.32% done, estimate finish Thu Jun 29 20:32:59 2006

    20:30:20: 66.54% done, estimate finish Thu Jun 29 20:32:59 2006

    20:30:21: 66.77% done, estimate finish Thu Jun 29 20:32:59 2006

    20:30:22: 66.99% done, estimate finish Thu Jun 29 20:32:59 2006

    20:30:23: 67.21% done, estimate finish Thu Jun 29 20:32:59 2006

    20:30:24: 67.43% done, estimate finish Thu Jun 29 20:32:59 2006

    20:30:25: 67.65% done, estimate finish Thu Jun 29 20:32:59 2006

    20:30:26: 67.88% done, estimate finish Thu Jun 29 20:32:59 2006

    20:30:27: 68.10% done, estimate finish Thu Jun 29 20:32:59 2006

    20:30:27: 68.32% done, estimate finish Thu Jun 29 20:32:57 2006

    20:30:28: 68.54% done, estimate finish Thu Jun 29 20:32:57 2006

    20:30:29: 68.76% done, estimate finish Thu Jun 29 20:32:57 2006

    20:30:30: 68.98% done, estimate finish Thu Jun 29 20:32:57 2006

    20:30:31: 69.21% done, estimate finish Thu Jun 29 20:32:57 2006

    20:30:32: 69.43% done, estimate finish Thu Jun 29 20:32:57 2006

    20:30:33: 69.65% done, estimate finish Thu Jun 29 20:32:57 2006

    20:30:34: 69.87% done, estimate finish Thu Jun 29 20:32:57 2006

    20:30:36: 70.09% done, estimate finish Thu Jun 29 20:32:58 2006

    20:30:37: 70.32% done, estimate finish Thu Jun 29 20:32:58 2006

    20:30:37: 70.54% done, estimate finish Thu Jun 29 20:32:56 2006

    20:30:38: 70.76% done, estimate finish Thu Jun 29 20:32:56 2006

    20:30:39: 70.98% done, estimate finish Thu Jun 29 20:32:56 2006

    20:30:40: 71.20% done, estimate finish Thu Jun 29 20:32:56 2006

    20:30:41: 71.42% done, estimate finish Thu Jun 29 20:32:56 2006

    20:30:41: 71.65% done, estimate finish Thu Jun 29 20:32:55 2006

    20:30:42: 71.87% done, estimate finish Thu Jun 29 20:32:55 2006

    20:30:43: 72.09% done, estimate finish Thu Jun 29 20:32:55 2006

    20:30:44: 72.31% done, estimate finish Thu Jun 29 20:32:54 2006

    20:30:45: 72.53% done, estimate finish Thu Jun 29 20:32:54 2006

    20:30:47: 72.75% done, estimate finish Thu Jun 29 20:32:56 2006

    20:30:47: 72.98% done, estimate finish Thu Jun 29 20:32:54 2006

    20:30:48: 73.20% done, estimate finish Thu Jun 29 20:32:54 2006

    20:30:49: 73.42% done, estimate finish Thu Jun 29 20:32:54 2006

    20:30:50: 73.64% done, estimate finish Thu Jun 29 20:32:54 2006

    20:30:51: 73.86% done, estimate finish Thu Jun 29 20:32:54 2006

    20:30:52: 74.09% done, estimate finish Thu Jun 29 20:32:54 2006

    20:30:52: 74.31% done, estimate finish Thu Jun 29 20:32:53 2006

    20:30:53: 74.53% done, estimate finish Thu Jun 29 20:32:52 2006

    20:30:54: 74.75% done, estimate finish Thu Jun 29 20:32:52 2006

    20:30:55: 74.97% done, estimate finish Thu Jun 29 20:32:52 2006

    20:30:56: 75.20% done, estimate finish Thu Jun 29 20:32:52 2006

    20:30:57: 75.42% done, estimate finish Thu Jun 29 20:32:52 2006

    20:30:58: 75.64% done, estimate finish Thu Jun 29 20:32:52 2006

    20:30:59: 75.86% done, estimate finish Thu Jun 29 20:32:52 2006

    20:30:59: 76.08% done, estimate finish Thu Jun 29 20:32:51 2006

    20:31:00: 76.30% done, estimate finish Thu Jun 29 20:32:51 2006

    20:31:01: 76.53% done, estimate finish Thu Jun 29 20:32:51 2006

    20:31:02: 76.75% done, estimate finish Thu Jun 29 20:32:51 2006

    20:31:02: 76.97% done, estimate finish Thu Jun 29 20:32:49 2006

    20:31:03: 77.19% done, estimate finish Thu Jun 29 20:32:49 2006

    20:31:04: 77.41% done, estimate finish Thu Jun 29 20:32:49 2006

    20:31:06: 77.63% done, estimate finish Thu Jun 29 20:32:50 2006

    20:31:07: 77.86% done, estimate finish Thu Jun 29 20:32:50 2006

    20:31:08: 78.08% done, estimate finish Thu Jun 29 20:32:50 2006

    20:31:08: 78.30% done, estimate finish Thu Jun 29 20:32:49 2006

    20:31:09: 78.52% done, estimate finish Thu Jun 29 20:32:49 2006

    20:31:09: 78.74% done, estimate finish Thu Jun 29 20:32:48 2006

    20:31:10: 78.97% done, estimate finish Thu Jun 29 20:32:48 2006

    20:31:11: 79.19% done, estimate finish Thu Jun 29 20:32:47 2006

    20:31:12: 79.41% done, estimate finish Thu Jun 29 20:32:47 2006

    20:31:13: 79.63% done, estimate finish Thu Jun 29 20:32:47 2006

    20:31:14: 79.85% done, estimate finish Thu Jun 29 20:32:47 2006

    20:31:15: 80.08% done, estimate finish Thu Jun 29 20:32:47 2006

    20:31:16: 80.30% done, estimate finish Thu Jun 29 20:32:47 2006

    20:31:17: 80.52% done, estimate finish Thu Jun 29 20:32:47 2006

    20:31:18: 80.74% done, estimate finish Thu Jun 29 20:32:47 2006

    20:31:18: 80.96% done, estimate finish Thu Jun 29 20:32:46 2006

    20:31:19: 81.18% done, estimate finish Thu Jun 29 20:32:46 2006

    20:31:20: 81.41% done, estimate finish Thu Jun 29 20:32:46 2006

    20:31:21: 81.63% done, estimate finish Thu Jun 29 20:32:46 2006

    20:31:22: 81.85% done, estimate finish Thu Jun 29 20:32:46 2006

    20:31:23: 82.07% done, estimate finish Thu Jun 29 20:32:46 2006

    20:31:23: 82.29% done, estimate finish Thu Jun 29 20:32:44 2006

    20:31:24: 82.51% done, estimate finish Thu Jun 29 20:32:44 2006

    20:31:25: 82.74% done, estimate finish Thu Jun 29 20:32:44 2006

    20:31:26: 82.96% done, estimate finish Thu Jun 29 20:32:44 2006

    20:31:27: 83.18% done, estimate finish Thu Jun 29 20:32:44 2006

    20:31:27: 83.40% done, estimate finish Thu Jun 29 20:32:43 2006

    20:31:28: 83.62% done, estimate finish Thu Jun 29 20:32:43 2006

    20:31:29: 83.85% done, estimate finish Thu Jun 29 20:32:43 2006

    20:31:30: 84.07% done, estimate finish Thu Jun 29 20:32:43 2006

    20:31:31: 84.29% done, estimate finish Thu Jun 29 20:32:43 2006

    20:31:31: 84.51% done, estimate finish Thu Jun 29 20:32:42 2006

    20:31:33: 84.73% done, estimate finish Thu Jun 29 20:32:43 2006

    20:31:33: 84.96% done, estimate finish Thu Jun 29 20:32:42 2006

    20:31:34: 85.18% done, estimate finish Thu Jun 29 20:32:42 2006

    20:31:36: 85.40% done, estimate finish Thu Jun 29 20:32:42 2006

    20:31:37: 85.62% done, estimate finish Thu Jun 29 20:32:43 2006

    20:31:37: 85.84% done, estimate finish Thu Jun 29 20:32:42 2006

    20:31:38: 86.06% done, estimate finish Thu Jun 29 20:32:42 2006

    20:31:39: 86.29% done, estimate finish Thu Jun 29 20:32:42 2006

    20:31:40: 86.51% done, estimate finish Thu Jun 29 20:32:42 2006

    20:31:41: 86.73% done, estimate finish Thu Jun 29 20:32:42 2006

    20:31:41: 86.95% done, estimate finish Thu Jun 29 20:32:40 2006

    20:31:42: 87.17% done, estimate finish Thu Jun 29 20:32:40 2006

    20:31:43: 87.39% done, estimate finish Thu Jun 29 20:32:40 2006

    20:31:44: 87.62% done, estimate finish Thu Jun 29 20:32:40 2006

    20:31:45: 87.84% done, estimate finish Thu Jun 29 20:32:40 2006

    20:31:46: 88.06% done, estimate finish Thu Jun 29 20:32:40 2006

    20:31:47: 88.28% done, estimate finish Thu Jun 29 20:32:40 2006

    20:31:47: 88.50% done, estimate finish Thu Jun 29 20:32:39 2006

    20:31:48: 88.73% done, estimate finish Thu Jun 29 20:32:39 2006

    20:31:49: 88.95% done, estimate finish Thu Jun 29 20:32:39 2006

    20:31:50: 89.17% done, estimate finish Thu Jun 29 20:32:39 2006

    20:31:51: 89.39% done, estimate finish Thu Jun 29 20:32:39 2006

    20:31:51: 89.61% done, estimate finish Thu Jun 29 20:32:38 2006

    20:31:52: 89.83% done, estimate finish Thu Jun 29 20:32:38 2006

    20:31:53: 90.06% done, estimate finish Thu Jun 29 20:32:38 2006

    20:31:53: 90.28% done, estimate finish Thu Jun 29 20:32:37 2006

    20:31:54: 90.50% done, estimate finish Thu Jun 29 20:32:37 2006

    20:31:56: 90.72% done, estimate finish Thu Jun 29 20:32:38 2006

    20:31:57: 90.94% done, estimate finish Thu Jun 29 20:32:38 2006

    20:31:57: 91.17% done, estimate finish Thu Jun 29 20:32:37 2006

    20:31:58: 91.39% done, estimate finish Thu Jun 29 20:32:37 2006

    20:31:59: 91.61% done, estimate finish Thu Jun 29 20:32:37 2006

    20:32:00: 91.83% done, estimate finish Thu Jun 29 20:32:37 2006

    20:32:01: 92.05% done, estimate finish Thu Jun 29 20:32:37 2006

    20:32:01: 92.27% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:02: 92.50% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:03: 92.72% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:04: 92.94% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:05: 93.16% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:06: 93.38% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:07: 93.61% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:08: 93.83% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:09: 94.05% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:10: 94.27% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:11: 94.49% done, estimate finish Thu Jun 29 20:32:36 2006

    20:32:11: 94.71% done, estimate finish Thu Jun 29 20:32:34 2006

    20:32:12: 94.94% done, estimate finish Thu Jun 29 20:32:34 2006

    20:32:13: 95.16% done, estimate finish Thu Jun 29 20:32:34 2006

    20:32:14: 95.38% done, estimate finish Thu Jun 29 20:32:34 2006

    20:32:15: 95.60% done, estimate finish Thu Jun 29 20:32:34 2006

    20:32:15: 95.82% done, estimate finish Thu Jun 29 20:32:33 2006

    20:32:16: 96.05% done, estimate finish Thu Jun 29 20:32:33 2006

    20:32:17: 96.27% done, estimate finish Thu Jun 29 20:32:33 2006

    20:32:18: 96.49% done, estimate finish Thu Jun 29 20:32:33 2006

    20:32:18: 96.71% done, estimate finish Thu Jun 29 20:32:32 2006

    20:32:19: 96.93% done, estimate finish Thu Jun 29 20:32:32 2006

    20:32:20: 97.15% done, estimate finish Thu Jun 29 20:32:32 2006

    20:32:21: 97.38% done, estimate finish Thu Jun 29 20:32:32 2006

    20:32:22: 97.60% done, estimate finish Thu Jun 29 20:32:32 2006

    20:32:23: 97.82% done, estimate finish Thu Jun 29 20:32:32 2006

    20:32:23: 98.04% done, estimate finish Thu Jun 29 20:32:31 2006

    20:32:24: 98.26% done, estimate finish Thu Jun 29 20:32:31 2006

    20:32:25: 98.49% done, estimate finish Thu Jun 29 20:32:31 2006

    20:32:26: 98.71% done, estimate finish Thu Jun 29 20:32:31 2006

    20:32:27: 98.93% done, estimate finish Thu Jun 29 20:32:31 2006

    20:32:28: 99.15% done, estimate finish Thu Jun 29 20:32:31 2006

    20:32:28: 99.37% done, estimate finish Thu Jun 29 20:32:30 2006

    20:32:29: 99.59% done, estimate finish Thu Jun 29 20:32:30 2006

    20:32:30: 99.82% done, estimate finish Thu Jun 29 20:32:30 2006

    20:32:31: Total translation table size: 0

    20:32:31: Total rockridge attributes bytes: 0

    20:32:31: Total di
    Quote Quote  
  2. Member ChrissyBoy's Avatar
    Join Date
    Feb 2003
    Location
    Yorkshire!
    Search Comp PM
    Can you try taking off "use mutli threads" in the video encoding options. That may help. FYI: I had no problem with your source files...
    SVCD2DVD v2.5, AVI/MPEG/HDTV/AviSynth/h264->DVD, PAL->NTSC conversion.
    VOB2MPG PRO, Extract mpegs from your DVDs - with you in control!
    Quote Quote  
  3. Member
    Join Date
    Mar 2005
    Location
    United Kingdom
    Search Comp PM
    i was just trying what chrissyboy suggested and my PC crashed while i tried?? i have been having the same problems as above


    lee
    Quote Quote  
  4. Member
    Join Date
    Mar 2005
    Location
    United Kingdom
    Search Comp PM
    well it didnt work for me? this time it didnt crash though just got to 91.1% and hung for ages so i had to turn svc2dvd off


    lee


    i have since found out that it was the source file that was the problem all is ok now
    Quote Quote  



Similar Threads

Visit our sponsor! Try DVDFab and backup Blu-rays!