VideoHelp Forum

Our website is made possible by displaying online advertisements to our visitors. Consider supporting us by disable your adblocker or buy Replay Video Capture or PlayON and record Netflix, HBO, etc! :)
+ Reply to Thread
Results 1 to 2 of 2
Thread
  1. Hi. I've used a script like this many times:
    Code:
    trim(100,1000)++trim(200,500).SmoothFPS2(int(framerate*3), 2).AssumeFPS(framerate)
    but with the vid I'm currently trying to use it on, I get the error "Splice: video framerate doesn't match"

    Given this is the first time I've seen this error with a tried and tested script, I can only assume the vid is 'rogue' unless someone can suggest cause and cure...

    Thanks for your time.
    Quote Quote  
  2. Turned out to be a simple fix - use FFVideoSource instead of LSMASHVideoSource. There must be some kind of conflict between this particular vid and Smash as it's never before refused the SmoothFPS2 command.
    Quote Quote  



Similar Threads