I used smartripper to get the .m2v and .ac3 files, Import the movie into Spruce up. Then I go to "clip properties" and the clip is only 1:23 mins long, yet the movie is 2:02 mins long. (I'm using NTFS on my hard drive, btw)I checked the original .ifo file in ifoedit and it confirms the length of the movie, but in the .ifo file Spruce up created the movie length is 1:23, Too add more confusion the "current project size" in Spruceup says 4.35GB, so it's recognizing how big it should be but isn't actually importing the whole movie! Can anybody help? I've successfully ripped movies before using this process. This one's really got me stumped