VideoHelp Forum




+ Reply to Thread
Results 1 to 3 of 3
  1. When i import a long video in Premiere Pro CS6, in time line, it's time is shorter than it's real time. ( for example a MP4 Film with 2:18:15 length changes to 2:18:6) . I want to sync an audio on film and this difference will makes error. what is the problem ?
    (sorry for my english!)
    Quote Quote  
  2. Member
    Join Date
    Jul 2012
    Location
    FrogLand
    Search PM
    Hi

    It's likely to be a Framerate problem.
    Check your project/Timeline properties, and be sure it's the same framerate than the footage you are using.
    For instance, if you shot in 25fps, both project and timeline settings must be set on 25 frame per second. (same if it's 23.976, or 29.970, 30 fps, etc. )

    The timeline settings may not be referred as "fps", but maybe as "Timecode Set" (check for SMTPE standards)

    Good luck
    Quote Quote  
  3. thanks, it solved
    Quote Quote  



Similar Threads

Visit our sponsor! Try DVDFab and backup Blu-rays!