VideoHelp Forum




+ Reply to Thread
Results 1 to 2 of 2
  1. hi there,

    I've been searching in all guides of this forum about how to estimate the output video size using TMPGenc Plus?

    I usually use CQ and VBR 2-pass.
    How can I estimate the size based on the min-max rate + %quality (for CQ) and min+max rate + num passes (for VBR)?

    Thanks in advance
    Quote Quote  
  2. For 2-pass VBR, use a bitrate calulator and use the Average bitrate value.

    For CQ, its not easy, but you might find some help a www.kvcd.net. They encourage use of CQ and have develeoped some tools to aid in this type of calculation.
    Quote Quote  



Similar Threads

Visit our sponsor! Try DVDFab and backup Blu-rays!